Untitled Document
Untitled Document

Pipelines

Natural gas would be sent out by means of a 16-inch flexible riser from each buoy down to two 36-inch subsea flowlines through a piggable Y to a 36-inch gas transmission line. The gas transmission line would transport natural gas to onshore facilities that interconnect with the Gulfstream Natural Gas System, L.L.C. and Tampa Electric Company (TECO) respectively, at locations approximately 3.6 miles and 5.8 miles inland in Manatee county, Florida. From there, the natural gas would be available to serve residential, commercial, industrial and electrical generation customers primarily in Florida and the Southeastern United States.